Airport · Case 04 · Example
Fog on the approach, centreline half dark.
At 02:20 a lighting circuit of the runway 25 centreline switches off, and every second light is dark. In clear weather that is enough, and the repair is planned for the day shift. At 02:35 the new forecast gives fog from 05:00, visibility 200 m. Then every landing needs CAT III, and CAT III needs exactly this centreline: if the fog comes, 14 arrivals from 05:40 cannot land.
- 2signals from OT, Operations
- 02:35Parallax links them
- 3options to decide

How the case unfolded
The lighting does not know about the fog, the forecast not about the fault.
- OTLighting control: runway 25 centreline, circuit B off
- OperationsForecast: fog from 05:00, visibility 200 m, about 40 %
- ParallaxAt 200 m every landing needs CAT III, and CAT III needs exactly the centreline that is half dark. If the fog comes (about 40 %), 14 arrivals between 05:40 and 08:00 cannot land, 4 of them long haul. Without the link it shows up around 04:45, too late for a cable fault.
What needs deciding now
What happens to circuit B and the 14 arrivals before 05:40?
- A
Call out lighting now
On site about 03:05, insulation measured by about 03:20. If the regulator is at fault, circuit B is back with the spare from about 03:45; if it is the cable in the runway, not before about 09:00. The technician is then missing from the day shift.
Circuit B from about 03:45 or not before about 09:00
- B
Have arrivals regulated
At the request of airport operations, air traffic control asks the Network Manager for a regulation from 05:40 to 08:00. About 10 short hauls wait at their origin instead of holding here.
About 1 to 2 h delay, even without fog
- C
Wait until 04:30
Wait for the next forecast and the visibility trend; the repair stays with the day shift. If the fog comes, the arrivals hold or divert.
In fog up to 14 arrivals affected
Sign-offAirport operations, with runway work agreed with the DFS tower (A, C). The tower asks the Network Manager for the regulation (B); the airlines decide on fuel and diversion. Whatever the choice, the airport publishes “CAT II/III not available” as a NOTAM.
An example with invented data, not a customer case. Times, numbers and consequences are estimates within the example.
More cases: Airport
- 01 · Security queue keeps growing A full queue and a flight plan moved forward.
- 02 · Sorter 2 stops, check-in 4 too The rerouting saves the passengers, not their bags.
- 03 · One login, three layers Three signals that only together make a case.
- 05 · Two outages planned for one night Each side plans with the other's feed.
Related
Your case, your data.
In a pilot, Quantryx connects your own sources from operations, OT and IT. Quantryx reads and suggests; your team decides and signs off.