Industry · Case 13 · Example
Pump fills an almost full tank.
At 02:20 the gauge on tank 3 reports 11.3 m and then stops changing, without a fault message. At 03:00 the tanker at the jetty reports 2,000 m³ delivered, without a pause. The control room waits for the switch alarm, the jetty sees a transfer on plan. Together: tank 3 holds about 12.0 m, and in about 110 minutes it would otherwise reach the overfill protection, the last barrier.
- 2signals from OT, Operations
- 03:00Parallax links them
- 3options to decide

How the case unfolded
A display stands still, the ship keeps pumping.
- OTTank 3: display stays at 11.3 m
- OperationsShip reports 2,000 m³, no pause
- ParallaxSince 02:20 the ship has delivered about 250 m³, and tank 3 shows not a centimetre more. No other tank rises and the leak probe is dry; only a manual dip is certain. Tank 3 holds about 12.0 m, and the switch alarm, high and high-high hang on the same gauge. It reaches the overfill protection at about 04:50.
What needs deciding now
How does the transfer go on?
- A
Switch to tank 4 now
Tank 4 open, tank 3 closed, without a pause. Tank 3 stays at about 12.0 m, about 1.9 m below the overfill protection. About 400 m³ meant for tank 3 stay on board until the repair. The cause is only assumed: if the petrol went elsewhere, the ship keeps pumping.
Tank 3 about 12.0 m · about 400 m³ on board
- B
By ship quantity to set level
Keep filling tank 3 until about 2,400 m³ by the ship, manual dip about 03:30, switch about 04:00. For an hour only the overfill protection protects automatically, the calculation rests on the ship quantity, and two people go onto the tank roof at night. If your operating instruction forbids filling by quantity, B is out.
Margin about 0.9 m · done about 07:45
- C
Stop until checked
Ship pump off; the instrument technician on call is on site about 04:05 and checks until about 05:05. The jetty is busy about 2 hours longer, and the next ship waits about 1 to 2 hours. Demurrage only starts after the discharge time.
Ship done about 09:50
Sign-offStopping (C): tank farm shift lead, the ship's master is informed. A: tank farm shift lead with the transfer supervisor. B: tank farm operations manager with the ship's master; roof work only with a work permit. The instrument technician on call is called in every case.
An example with invented data, not a customer case. Times, numbers and consequences are estimates within the example.
More cases: Industry
Related
Your case, your data.
In a pilot, Quantryx connects your own sources from operations, OT and IT. Quantryx reads and suggests; your team decides and signs off.