Industry · Case 14 · Example
Production halts after update.
At 05:45 IT completes an ERP update: post tests green, change closed. At 06:08 line 2 stops and reports “no order”. IT sees a clean change, the shift a gap after the shift change. Together: no order has reached the MES since 05:44, and from about 06:55 the whole hall would otherwise stand still, for about 70 minutes. The rollback is possible only until 08:00.
- 2signals from IT, OT
- 06:08Parallax links them
- 3options to decide

How the case unfolded
A green update, then the line stops.
- ITERP update completed, post tests green
- OTLine 2 stopped, reports “no order”
- ParallaxNo order has reached the MES since 05:44; normally one arrives about every 7 minutes. About 3 orders wait in the ERP for dispatch, none with an error. The common point is the change at 05:45. Line 1 stops about 06:40, line 3 about 06:55, and nothing on the lines is broken.
What needs deciding now
How do the lines keep running?
- A
Roll back the update
Rollback to 05:15 from about 06:15 to 07:15, orders from about 07:20. All bookings since 05:15 are redone, and the update needs a new window.
Hall stands about 25 min · line 2 about 70 min
- B
Orders in the MES by hand
The shift lead creates orders from the day plan, and line 2 runs from about 06:25. Then about 2 to 3 hours of rebooking confirmations, consumption and batches. Traceability stays open until then, and plan changes after 05:44 are missing. Only with quality assurance.
Hall stands about 0 min · rebooking about 2 to 3 h
- C
Keep it, find the fault
The change team searches, duration open. If the fault is found by about 06:50, the hall keeps running, otherwise it stops from about 06:55. The later the find, the tighter the rollback before 08:00.
Open · else hall stops about 06:55
Sign-offA: change owner and head of IT as an emergency change, with the consent of production management. B: production management or the production shift lead, with quality assurance. C: the change team; production management sets the deadline.
An example with invented data, not a customer case. Times, numbers and consequences are estimates within the example.