Energy · Case 06 · Example
Remote access to the substation.
About 25 MW can be reached from a session that may only service bay 1. At 01:12 the contractor logs in for maintenance on bay 1. At 01:20 a switching command for bay 3 is selected, with no switching order. Quantryx links the two at 01:20.
- 2signals from IT, OT
- 01:20Parallax links them
- 3options to decide

How the case unfolded
Bay 1 was approved, bay 3 was selected.
- ITRemote access: login for bay 1 maintenance, as announced
- OTBay 3: switching command selected, no switching order
- ParallaxThe selection on bay 3 came from the maintenance session of 01:12. Only bay 1 is approved, and the account reaches all four bays. Grid control sees “origin station”, IT a session, the work order bay 1: that it is the same session is in none of the three systems.
What needs deciding now
How much is cut before it is clear who was on bay 3?
- A
Ask, finish the session under supervision
IT security joins the session live, and grid control calls the technician. The parameter set on bay 1 is finished, the session ends about 01:45, and bay 1 returns to the grid at 04:00 as planned. Until then about 25 MW stay reachable, and a command with execution acts within seconds.
Session closed about 01:45 · about 25 MW reachable until then
- B
End the session now, lock the account
IT security ends the session at about 01:25. The parameter set on bay 1 is aborted and the protection relay has no valid setting: bay 1 stays off until the contractor is on site, and the airport starts its day on one feed. If the session changed anything on bays 2 to 4, it only shows at the next fault.
Session closed about 01:25 · bay 1 off until about 08:00
- C
End it and staff the station
As B. In addition an authorized switching engineer is on site about 02:00, disconnects the station computer from the network and compares the parameters of all bays with the approved settings. Grid control keeps operating through telecontrol, and until about 04:00 switching runs only by switching call with the engineer.
Bays checked about 03:30 · bay 1 off until about 08:00
Sign-offGrid control room shift lead with IT security (on call); if the emergency plan provides for ending the session, B is approved in advance. The shift lead orders staffing the station (C), and on site only the authorized switching engineer switches. The information security officer assesses whether the incident is significant; management is accountable.
An example with invented data, not a customer case. Times, numbers and consequences are estimates within the example.