Energy · Case 07 · Example
Wind farm feeds in unsteadily.
From about 11:40 up to about 18 MW of solar trip on overvoltage. The wind farm's reactive power has been swinging since the morning. The tap changer steps in the same rhythm. Quantryx links the two at 10:06.
- 2signals from Operations, OT
- 10:06Parallax links them
- 3options to decide

How the case unfolded
The operator sees one rhythm, grid control the other.
- OperationsReactive power swings about every 4 min, steady wind
- OTTap changer steps about 30 times an hour
- ParallaxReactive power and tap steps run in the same rhythm, both since about 08:05: park controller and tap changer work against each other. At midday the sun needs about 3 of the 4 taps, the swing the fourth. From about 11:40 the voltage is above its band at every peak of the swing.
What needs deciding now
How does the voltage stay within its band over midday?
- A
Fixed reactive power for the farm
Grid control sets a fixed import of about 4 Mvar, effective about 10:15, and the swing ends. About 2 taps remain at midday. The farm no longer follows the voltage, in the evening the fixed value pushes the voltage down, and the controller fault stays until the operator finds it.
About 0 MW solar tripped · farm no longer follows the voltage
- B
Tap changer on manual
From about 10:08 the shift holds the tap. Without a counterpart the farm settles, and Q(U) keeps supporting. At midday the shift steps about 3 times by hand; in a sudden cloud gap about 0 to 5 MW trip. The park controller stays faulty.
About 0 to 5 MW · one person until about 18:00
- C
Wind farm off the grid until checked
As redispatch the farm is off the grid from about 10:10 to about 14:00; the swing ends at once and the tap changer is calm. About 24 MW of wind power are missing for about 4 h, about 100 MWh, compensated under § 13a EnWG and paid through grid fees.
About 0 MW solar · about 100 MWh of wind lost
Sign-offGrid control room shift lead. For A it sets the procedure as the grid connection agreement allows, and the wind farm's operations management implements or confirms. C is a redispatch measure; the operator and the direct marketer are informed.
An example with invented data, not a customer case. Times, numbers and consequences are estimates within the example.